Business & pro

Reorder point and safety stock

When to reorder a product and how many, so you never run out.

Embed this calculator on your website

Copy this code and paste it into your page (WordPress, Wix, Webflow, HTML…). It's free: please keep the link to HOD Calc.

How it works

Reorder point = daily sales × (lead time + safety days). Economic order quantity = √(2 × yearly demand × order cost / holding cost).

Results are for guidance only and do not replace professional advice.

Worked example

With the default values:

  • Sales per day25
  • Lead time (days)7
  • Safety stock (days)3
  • Cost per order60
  • Holding cost per unit per year2.5

you get:

  • Reorder when stock reaches250 units
  • Safety stock75
  • Economic order quantity662
  • Orders per year13.8

Frequently asked questions

How does the “Reorder point and safety stock” tool work?

Reorder point = daily sales × (lead time + safety days). Economic order quantity = √(2 × yearly demand × order cost / holding cost).

What do I need to enter?

Just fill in: sales per day, lead time, safety stock, cost per order, holding cost per unit per year. The result updates as you type.

Can you give an example?

Sales per day: 25; Lead time (days): 7; Safety stock (days): 3; Cost per order: 60; Holding cost per unit per year: 2.5 → Reorder when stock reaches: 250 units; Safety stock: 75.

Is this calculator free, and is my data private?

Yes. HOD Calc is completely free with no sign-up. The calculation runs in your browser: nothing you type is sent or stored.